Smart charging within your existing connection
Charge more vehicles without exceeding the contracted peak load (GTV).
Many organizations want to electrify, but immediately face the same challenge: the grid connection is limited. Requesting extra capacity can take a long time, be costly, or simply not possible due to grid congestion.

By smart energy management, Maxem manages the available capacity in real-time between charging points, vehicles, buildings, solar panels, and batteries, without exceeding the contracted capacity.

Charge more vehicles without exceeding the contracted peak load (GTV).

Distribute energy in real-time based on building consumption, charging needs, and available grid space.

Many locations were not originally designed for large-scale electric charging.

The available capacity at the location is continuously changing. Machines start up, buildings consume more energy, solar panels feed back, or batteries are charged.
With Dynamic Load Management (DLM), the Maxem Energy Controller measures in real-time how much capacity is available. The system then automatically controls the charging stations based on the current situation.

The physical limit of the connection must never be exceeded. That's why GridGuard continuously monitors the total energy consumption on site.
Locations with a limited grid connection
Organizations waiting for grid reinforcement
Logistics locations with electric trucks or vans
Business locations with high simultaneous energy consumption
Offices, logistic hubs, and depots with solar panels or batteries
Situations where more charging capacity is needed without large infrastructure investments

Maxem not only looks at charging stations but at the entire energy ecosystem of the location.

Maxem is used daily at locations where grid capacity is extremely limited.
At transportation company Jan Bakker, for example, 15 electric trucks are charged on a grid connection of just 60 kW, by smartly using load management, batteries, and solar energy.
The result: no expensive grid reinforcement, no exceedances, lower energy costs, and deployable vehicles every morning
“Diamond elite, edge, coordinated bean time. Who wants to own a turtle told. But want, muster happy chosen name found noodle edge.”

NiCHOLAS
CEO, MAXEM
Schedule a demo and discover how Maxem achieves more charging capacity without grid reinforcement.